Hyderabad Jn to Rawalpindi
Hazara Express 11UP — within 15 minutes of the scheduled time 27% of the time, typically 45 minutes late, over 12 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Hyderabad Jn to Rawalpindi it typically adds 2h 03m, from 28 recorded runs. At Rawalpindi it has typically arrived 164 minutes late, from 33 recorded runs.
Every train, compared
7 of 8 with 7+ daysOver this leg is the CHANGE in a train's delay between Hyderabad Jn and Rawalpindi on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Hyderabad Jn — no booked arrival at Hyderabad Jn to measure from at all. Figures cover runs recorded between 30 July 2026 and 5 October 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 5Green Line 5UP | 00:40 +1d | 20:35 +1d | 19h 55m | 1,332 km | +41 min | 27% | adds 2h 27m · 33 |
| 1Khyber Mail 1UP | 01:10 +1d | 01:20 +2d | 24h 10m | 1,392 km | +1h 39m | 9% | adds 3h 51m · 25 |
| 11Hazara Express 11UP | 10:10 | 13:35 +1d | 27h 25m | 1,342 km | +45 min | 27% | adds 2h 03m · 28 |
| 13Awam Express 13UP | 10:40 | 13:20 +1d | 26h 40m | 1,394 km | +1h 42m | 6% | adds 2h 13m · 37 |
| 47Rehman Baba Express 47UP | 14:55 | 14:25 +1d | 23h 30m | 1,733 km | +1h 43m | 10% | adds 2h 49m · 36 |
| 45Pakistan Express 45UP | 16:48 | 17:35 +1d | 24h 47m | 1,323 km | +2h 25m | 2% | adds 2h 06m · 18 |
| 7Tezgam 7UP | 20:10 | 20:00 +1d | 23h 50m | 1,377 km | +1h 59m | 5% | adds 2h 56m · 29 |
| 35Sir Sayyed Express 35UP | 23:45 | 21:30 +1d | 21h 45m | not measured yet | — | — | no data |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Green Line 5UP5گرين لائن5 اپ00:40 +1d→20:35 +1d19h 55m27% on time · +41 minadds 2h 27m over this leg · 33 runs
- Khyber Mail 1UP1خیبر میل 1 اپ01:10 +1d→01:20 +2d24h 10m9% on time · +1h 39madds 3h 51m over this leg · 25 runs
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ10:10→13:35 +1d27h 25m27% on time · +45 minadds 2h 03m over this leg · 28 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ10:40→13:20 +1d26h 40m6% on time · +1h 42madds 2h 13m over this leg · 37 runs
- Rehman Baba Express 47UP47رحمان بابا ایکسپریس47اپ14:55→14:25 +1d23h 30m10% on time · +1h 43madds 2h 49m over this leg · 36 runs
- Pakistan Express 45UP45پاکستان ایکسپریس 45 اپ16:48→17:35 +1d24h 47m2% on time · +2h 25madds 2h 06m over this leg · 18 runs
- Tezgam 7UP7تيزگام 7 اپ20:10→20:00 +1d23h 50m5% on time · +1h 59madds 2h 56m over this leg · 29 runs
- Sir Sayyed Express 35UP35سر سید ایکپریس 35اپ23:45→21:30 +1d21h 45mno delay figure yetno data over this leg
Travelling the other way? Rawalpindi to Hyderabad Jn trains →
Common questions
How many trains run from Hyderabad Jn to Rawalpindi?
8 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Hyderabad Jn to Rawalpindi?
Green Line 5UP, booked at 19h 55m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Hyderabad Jn to Rawalpindi is most likely to be on time?
Hazara Express 11UP has the best recorded punctuality of the services we hold enough history for: 27% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 45 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 7 of 8 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Hyderabad Jn to Rawalpindi?
Yes. 7 of the 8 scheduled services are booked to arrive on a later day than they depart: Khyber Mail 1UP, Hazara Express 11UP, Awam Express 13UP, Rehman Baba Express 47UP and others.
Do trains lose time between Hyderabad Jn and Rawalpindi?
Typically yes. Khyber Mail 1UP adds about 3h 51m to its delay over this leg, measured across 25 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Hyderabad Jn to Rawalpindi by train?
It is between 1,323 and 1,733 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 7 of the 8 services; the rest of the track on this route has not been traced yet.
Are these Hyderabad Jn to Rawalpindi timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.