Khanewal Jn to Rohri Jn.
Green Line 6DN — within 15 minutes of the scheduled time 36% of the time, typically 52 minutes late, over 24 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Khanewal Jn to Rohri Jn. it typically adds 34 min, from 64 recorded runs. At Rohri Jn. it has typically arrived 84 minutes late, from 90 recorded runs.
Every train, compared
13 of 15 with 7+ daysOver this leg is the CHANGE in a train's delay between Khanewal Jn and Rohri Jn. on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Khanewal Jn — no booked arrival at Khanewal Jn to measure from at all. Figures cover runs recorded between 30 July 2026 and 19 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 6Green Line 6DN | 00:25 +1d | 06:10 +1d | 5h 45m | 460 km | +52 min | 36% | adds 34 min · 64 |
| 48Rehman Baba Express 48DN | 00:27 +1d | 07:40 +1d | 7h 13m | not measured yet | +2h 21m | 10% | adds 1h 15m · 62 |
| 44Shah Hussain Express 44DN | 02:10 +1d | 08:10 +1d | 6h | not measured yet | — | — | no data |
| 12Hazara Express 12DN | 06:00 +1d | 14:55 +1d | 8h 55m | not measured yet | +1h 32m | 15% | adds 16 min · 41 |
| 2Khyber Mail 2DN | 12:55 +1d | 21:40 +1d | 8h 45m | not measured yet | +1h 58m | 8% | adds 29 min · 33 |
| 46Pakistan Express 46DN | 16:35 | 00:10 +1d | 7h 35m | not measured yet | +2h 26m | 4% | adds 1h 13m · 59 |
| 10Allama Iqbal Express 10DN | 17:25 | 00:25 +1d | 7h | not measured yet | +44 min | 28% | adds 52 min · 61 |
| 8Tezgam 8DN | 18:15 | 01:30 +1d | 7h 15m | not measured yet | +1h 08m | 17% | adds 1h 01m · 62 |
| 18Millat Express 18DN | 18:50 | 01:10 +1d | 6h 20m | not measured yet | +1h | 31% | adds 1h 03m · 51 |
| 34Pak Business 34DN | 19:25 | 01:55 +1d | 6h 30m | not measured yet | +2h 28m | 9% | adds 55 min · 55 |
| 40Jaffar Express 40DN | 20:10 | 03:35 +1d | 7h 25m | not measured yet | +52 min | 20% | adds 28 min · 31 |
| 42Karakoram Express 42DN | 21:30 | 03:45 +1d | 6h 15m | not measured yet | +1h 32m | 20% | adds 1h 14m · 42 |
| 16Karachi Express 16DN | 22:00 | 05:00 +1d | 7h | not measured yet | +2h 41m | 8% | adds 33 min · 59 |
| 36Sir Sayyed Express 36DN | 23:25 | 05:35 +1d | 6h 10m | not measured yet | — | — | no data |
| 14Awam Express 14DN | 23:50 | 08:55 +1d | 9h 05m | not measured yet | +1h 22m | 15% | adds 19 min · 64 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Green Line 6DN6گرين لائن 6 ڈاؤن00:25 +1d→06:10 +1d5h 45m36% on time · +52 minadds 34 min over this leg · 64 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن00:27 +1d→07:40 +1d7h 13m10% on time · +2h 21madds 1h 15m over this leg · 62 runs
- Shah Hussain Express 44DN44شاہ حسین ایکسپریس 44 ڈاؤن02:10 +1d→08:10 +1d6hno delay figure yetno data over this leg
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن06:00 +1d→14:55 +1d8h 55m15% on time · +1h 32madds 16 min over this leg · 41 runs
- Khyber Mail 2DN2خیبر میل 2 ڈائون12:55 +1d→21:40 +1d8h 45m8% on time · +1h 58madds 29 min over this leg · 33 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون16:35→00:10 +1d7h 35m4% on time · +2h 26madds 1h 13m over this leg · 59 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون17:25→00:25 +1d7h28% on time · +44 minadds 52 min over this leg · 61 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن18:15→01:30 +1d7h 15m17% on time · +1h 08madds 1h 01m over this leg · 62 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون18:50→01:10 +1d6h 20m31% on time · +1hadds 1h 03m over this leg · 51 runs
- Pak Business 34DN34پاک بزنس 34 ڈائون19:25→01:55 +1d6h 30m9% on time · +2h 28madds 55 min over this leg · 55 runs
- Jaffar Express 40DN40جعفر ایکسپریس 40 ڈائون20:10→03:35 +1d7h 25m20% on time · +52 minadds 28 min over this leg · 31 runs
- Karakoram Express 42DN42قراقرم ایکسپریس 42 ڈائون21:30→03:45 +1d6h 15m20% on time · +1h 32madds 1h 14m over this leg · 42 runs
- Karachi Express 16DN16کراچی ایکسپریس 16 ڈائون22:00→05:00 +1d7h8% on time · +2h 41madds 33 min over this leg · 59 runs
- Sir Sayyed Express 36DN36سر سید ایکپریس 36 ڈاؤن23:25→05:35 +1d6h 10mno delay figure yetno data over this leg
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون23:50→08:55 +1d9h 05m15% on time · +1h 22madds 19 min over this leg · 64 runs
Travelling the other way? Rohri Jn. to Khanewal Jn trains →
Common questions
How many trains run from Khanewal Jn to Rohri Jn.?
15 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Khanewal Jn to Rohri Jn.?
Green Line 6DN, booked at 5h 45m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Khanewal Jn to Rohri Jn. is most likely to be on time?
Green Line 6DN has the best recorded punctuality of the services we hold enough history for: 36% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 52 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 13 of 15 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Khanewal Jn to Rohri Jn.?
Yes. 10 of the 15 scheduled services are booked to arrive on a later day than they depart: Pakistan Express 46DN, Allama Iqbal Express 10DN, Tezgam 8DN, Millat Express 18DN and others.
Do trains lose time between Khanewal Jn and Rohri Jn.?
Typically yes. Rehman Baba Express 48DN adds about 1h 15m to its delay over this leg, measured across 62 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Khanewal Jn to Rohri Jn. by train?
It is about 460 km along the track. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 1 of the 15 services; the rest of the track on this route has not been traced yet.
Are these Khanewal Jn to Rohri Jn. timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.