Shalimar Express 28DN — within 15 minutes of the scheduled time 39% of the time, typically 27 minutes late, over 7 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Rohri Jn. to Nawabshah Jn. it typically adds 14 min, from 25 recorded runs. At Nawabshah Jn. it has typically arrived 41 minutes late, from 31 recorded runs.
Every train, compared
7 of 13 with 7+ daysOver this leg is the CHANGE in a train's delay between Rohri Jn. and Nawabshah Jn. on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rohri Jn. — no booked arrival at Rohri Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 2 October 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 26Bahauddin Zikria Express 26DN | 00:01 +1d | 02:54 +1d | 2h 53m | 185 km | — | — | adds 27 min · 24 |
| 10Allama Iqbal Express 10DN | 00:50 +1d | 03:45 +1d | 2h 55m | 185 km | +1h 11m | 24% | adds 22 min · 35 |
| 8Tezgam 8DN | 01:55 +1d | 04:54 +1d | 2h 59m | 184 km | — | — | adds 32 min · 37 |
| 34Pak Business 34DN | 03:25 +1d | 06:10 +1d | 2h 45m | 184 km | — | — | adds 21 min · 36 |
| 18Millat Express 18DN | 04:20 +1d | 07:21 +1d | 3h 01m | 185 km | +2h 35m | 8% | adds 25 min · 38 |
| 16Karachi Express 16DN | 05:25 +1d | 08:10 +1d | 2h 45m | 184 km | — | — | adds 13 min · 38 |
| 48Rehman Baba Express 48DN | 08:05 +1d | 11:23 +1d | 3h 18m | 185 km | +1h 56m | 14% | adds 20 min · 36 |
| 14Awam Express 14DN | 09:20 +1d | 13:16 +1d | 3h 56m | 185 km | +2h 14m | 8% | adds 22 min · 39 |
| 12Hazara Express 12DN | 15:20 +1d | 18:45 +1d | 3h 25m | 186 km | — | — | makes up 2 min · 36 |
| 28Shalimar Express 28DN | 19:35 | 22:08 | 2h 33m | not measured yet | +27 min | 39% | adds 14 min · 25 |
| 146Sukkur Express 146DN | 21:30 | 00:50 +1d | 3h 20m | not measured yet | — | — | adds 48 min · 13 |
| 2Khyber Mail 2DN | 21:35 +1d | 00:08 +2d | 2h 33m | 184 km | +2h 12m | 8% | adds 28 min · 20 |
| 38Fareed Express 38DN | 23:00 | 02:02 +1d | 3h 02m | not measured yet | +44 min | 16% | adds 13 min · 29 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون00:01 +1d→02:54 +1d2h 53mno delay figure yetadds 27 min over this leg · 24 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون00:50 +1d→03:45 +1d2h 55m24% on time · +1h 11madds 22 min over this leg · 35 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن01:55 +1d→04:54 +1d2h 59mno delay figure yetadds 32 min over this leg · 37 runs
- Pak Business 34DN34پاک بزنس 34 ڈائون03:25 +1d→06:10 +1d2h 45mno delay figure yetadds 21 min over this leg · 36 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون04:20 +1d→07:21 +1d3h 01m8% on time · +2h 35madds 25 min over this leg · 38 runs
- Karachi Express 16DN16کراچی ایکسپریس 16 ڈائون05:25 +1d→08:10 +1d2h 45mno delay figure yetadds 13 min over this leg · 38 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن08:05 +1d→11:23 +1d3h 18m14% on time · +1h 56madds 20 min over this leg · 36 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون09:20 +1d→13:16 +1d3h 56m8% on time · +2h 14madds 22 min over this leg · 39 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن15:20 +1d→18:45 +1d3h 25mno delay figure yetmakes up 2 min over this leg · 36 runs
- Shalimar Express 28DN28شالیمار ایکسپریس 28 ڈائون19:35→22:082h 33m39% on time · +27 minadds 14 min over this leg · 25 runs
- Sukkur Express 146DN146سکھر ایکسپریس146ڈاؤن21:30→00:50 +1d3h 20mno delay figure yetadds 48 min over this leg · 13 runs
- Khyber Mail 2DN2خیبر میل 2 ڈائون21:35 +1d→00:08 +2d2h 33m8% on time · +2h 12madds 28 min over this leg · 20 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون23:00→02:02 +1d3h 02m16% on time · +44 minadds 13 min over this leg · 29 runs
Travelling the other way? Nawabshah Jn. to Rohri Jn. trains →
Common questions
How many trains run from Rohri Jn. to Nawabshah Jn.?
13 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rohri Jn. to Nawabshah Jn.?
Shalimar Express 28DN, booked at 2h 33m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rohri Jn. to Nawabshah Jn. is most likely to be on time?
Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 39% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 27 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 7 of 13 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rohri Jn. to Nawabshah Jn.?
Yes. 3 of the 13 scheduled services are booked to arrive on a later day than they depart: Sukkur Express 146DN, Khyber Mail 2DN, Fareed Express 38DN.
Do trains lose time between Rohri Jn. and Nawabshah Jn.?
Typically yes. Sukkur Express 146DN adds about 48 min to its delay over this leg, measured across 13 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Rohri Jn. to Nawabshah Jn. by train?
It is between 184 and 186 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 10 of the 13 services; the rest of the track on this route has not been traced yet.
Are these Rohri Jn. to Nawabshah Jn. timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.