Hazara Express 11UP — within 15 minutes of the scheduled time 22% of the time, typically 53 minutes late, over 11 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Rohri Jn. to Sadiqabad it typically makes up 2 min, from 37 recorded runs. At Sadiqabad it has typically arrived 46 minutes late, from 46 recorded runs.
Every train, compared
9 of 9 with 7+ daysOver this leg is the CHANGE in a train's delay between Rohri Jn. and Sadiqabad on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rohri Jn. — no booked arrival at Rohri Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 6 October 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 9Allama Iqbal Express 9UP | 00:05 +1d | 02:48 +1d | 2h 43m | 152 km | +2h 45m | 5% | no change · 41 |
| 17Millat Express 17UP | 01:05 +1d | 03:23 +1d | 2h 18m | 152 km | +3h 27m | 0% | adds 30 min · 38 |
| 25Bahauddin Zikria Express 25UP | 03:05 +1d | 04:52 +1d | 1h 47m | 152 km | +2h | 6% | adds 57 min · 22 |
| 37Fareed Express 37UP | 05:00 +1d | 06:58 +1d | 1h 58m | 152 km | +1h 22m | 7% | adds 52 min · 31 |
| 1Khyber Mail 1UP | 05:55 +1d | 08:12 +1d | 2h 17m | 152 km | +1h 45m | 9% | adds 58 min · 33 |
| 11Hazara Express 11UP | 16:00 | 18:52 | 2h 52m | 152 km | +53 min | 22% | makes up 2 min · 37 |
| 13Awam Express 13UP | 17:20 | 19:55 | 2h 35m | 152 km | +1h 43m | 6% | adds 31 min · 38 |
| 39Jaffar Express 39UP | 20:50 | 23:16 | 2h 26m | not measured yet | +1h 51m | 0% | adds 25 min · 17 |
| 45Pakistan Express 45UP | 22:00 | 00:06 +1d | 2h 06m | 152 km | +2h 15m | 3% | adds 50 min · 37 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Allama Iqbal Express 9UP9علامہ اقبال ایکسپریس 9 اپ00:05 +1d→02:48 +1d2h 43m5% on time · +2h 45mno change over this leg · 41 runs
- Millat Express 17UP17ملت ایکسپریس 17 اپ01:05 +1d→03:23 +1d2h 18m0% on time · +3h 27madds 30 min over this leg · 38 runs
- Bahauddin Zikria Express 25UP25بہائو الدین زکریا ایکسپری25 اپ03:05 +1d→04:52 +1d1h 47m6% on time · +2hadds 57 min over this leg · 22 runs
- Fareed Express 37UP37فرید ایکسپریس 37 اپ05:00 +1d→06:58 +1d1h 58m7% on time · +1h 22madds 52 min over this leg · 31 runs
- Khyber Mail 1UP1خیبر میل 1 اپ05:55 +1d→08:12 +1d2h 17m9% on time · +1h 45madds 58 min over this leg · 33 runs
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ16:00→18:522h 52m22% on time · +53 minmakes up 2 min over this leg · 37 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ17:20→19:552h 35m6% on time · +1h 43madds 31 min over this leg · 38 runs
- Jaffar Express 39UP39جعفر ایکسپریس 39 اپ20:50→23:162h 26m0% on time · +1h 51madds 25 min over this leg · 17 runs
- Pakistan Express 45UP45پاکستان ایکسپریس 45 اپ22:00→00:06 +1d2h 06m3% on time · +2h 15madds 50 min over this leg · 37 runs
Travelling the other way? Sadiqabad to Rohri Jn. trains →
Common questions
How many trains run from Rohri Jn. to Sadiqabad?
9 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rohri Jn. to Sadiqabad?
Bahauddin Zikria Express 25UP, booked at 1h 47m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rohri Jn. to Sadiqabad is most likely to be on time?
Hazara Express 11UP has the best recorded punctuality of the services we hold enough history for: 22% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 53 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 9 of 9 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rohri Jn. to Sadiqabad?
Yes. 1 of the 9 scheduled services is booked to arrive on a later day than it departs: Pakistan Express 45UP.
Do trains lose time between Rohri Jn. and Sadiqabad?
Typically yes. Khyber Mail 1UP adds about 58 min to its delay over this leg, measured across 33 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Rohri Jn. to Sadiqabad by train?
It is about 152 km along the track. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 8 of the 9 services; the rest of the track on this route has not been traced yet.
Are these Rohri Jn. to Sadiqabad timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.