Bahawalpur to Drigh Road
Shalimar Express 28DN — within 15 minutes of the scheduled time 39% of the time, typically 27 minutes late, over 7 days of recorded runs across every stop of its full journey, not this segment alone.
Every train, compared
9 of 17 with 7+ daysOver this leg is the CHANGE in a train's delay between Bahawalpur and Drigh Road on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Bahawalpur — no booked arrival at Bahawalpur to measure from at all. Figures cover runs recorded between 30 July 2026 and 3 October 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 16Karachi Express 16DN | 00:20 +1d | 13:05 +1d | 12h 45m | 816 km | — | — | adds 1h 10m · 37 |
| 36Sir Sayyed Express 36DN | 00:50 +1d | 13:25 +1d | 12h 35m | not measured yet | — | — | no data |
| 6Green Line 6DN | 01:40 +1d | 13:50 +1d | 12h 10m | 814 km | +39 min | 36% | adds 1h 22m · 38 |
| 14Awam Express 14DN | 02:14 +1d | 18:54 +1d | 16h 40m | 821 km | +2h 14m | 8% | adds 1h 13m · 37 |
| 48Rehman Baba Express 48DN | 02:45 +1d | 16:23 +1d | 13h 38m | 817 km | +1h 56m | 14% | adds 2h 16m · 36 |
| 44Shah Hussain Express 44DN | 03:36 +1d | 15:33 +1d | 11h 57m | not measured yet | — | — | no data |
| 12Hazara Express 12DN | 08:45 +1d | 00:00 +2d | 15h 15m | 820 km | — | — | adds 15 min · 36 |
| 28Shalimar Express 28DN | 14:27 | — +1d | — | not measured yet | +27 min | 39% | no data |
| 2Khyber Mail 2DN | 15:00 +1d | 04:45 +2d | 13h 45m | 820 km | +2h 12m | 8% | adds 1h 55m · 21 |
| 38Fareed Express 38DN | 16:18 | 07:16 +1d | 14h 58m | not measured yet | +44 min | 16% | adds 49 min · 29 |
| 26Bahauddin Zikria Express 26DN | 17:50 | 08:02 +1d | 14h 12m | 819 km | — | — | adds 1h 27m · 23 |
| 46Pakistan Express 46DN | 18:55 | 08:18 +1d | 13h 23m | 815 km | +1h 04m | 4% | adds 1h 58m · 34 |
| 10Allama Iqbal Express 10DN | 19:20 | 08:48 +1d | 13h 28m | 817 km | +1h 11m | 24% | adds 1h 51m · 34 |
| 8Tezgam 8DN | 20:29 | 09:55 +1d | 13h 26m | 813 km | — | — | adds 1h 59m · 35 |
| 42Karakoram Express 42DN | 21:47 | 10:15 +1d | 12h 28m | not measured yet | — | — | adds 1h 56m · 26 |
| 34Pak Business 34DN | 22:14 | 11:01 +1d | 12h 47m | 813 km | — | — | adds 1h 42m · 36 |
| 18Millat Express 18DN | 22:54 | 12:06 +1d | 13h 12m | 815 km | +2h 35m | 8% | adds 1h 58m · 38 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Karachi Express 16DN16کراچی ایکسپریس 16 ڈائون00:20 +1d→13:05 +1d12h 45mno delay figure yetadds 1h 10m over this leg · 37 runs
- Sir Sayyed Express 36DN36سر سید ایکپریس 36 ڈاؤن00:50 +1d→13:25 +1d12h 35mno delay figure yetno data over this leg
- Green Line 6DN6گرين لائن 6 ڈاؤن01:40 +1d→13:50 +1d12h 10m36% on time · +39 minadds 1h 22m over this leg · 38 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون02:14 +1d→18:54 +1d16h 40m8% on time · +2h 14madds 1h 13m over this leg · 37 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن02:45 +1d→16:23 +1d13h 38m14% on time · +1h 56madds 2h 16m over this leg · 36 runs
- Shah Hussain Express 44DN44شاہ حسین ایکسپریس 44 ڈاؤن03:36 +1d→15:33 +1d11h 57mno delay figure yetno data over this leg
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن08:45 +1d→00:00 +2d15h 15mno delay figure yetadds 15 min over this leg · 36 runs
- Shalimar Express 28DN28شالیمار ایکسپریس 28 ڈائون14:27→— +1d—39% on time · +27 minno data over this leg
- Khyber Mail 2DN2خیبر میل 2 ڈائون15:00 +1d→04:45 +2d13h 45m8% on time · +2h 12madds 1h 55m over this leg · 21 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون16:18→07:16 +1d14h 58m16% on time · +44 minadds 49 min over this leg · 29 runs
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون17:50→08:02 +1d14h 12mno delay figure yetadds 1h 27m over this leg · 23 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون18:55→08:18 +1d13h 23m4% on time · +1h 04madds 1h 58m over this leg · 34 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون19:20→08:48 +1d13h 28m24% on time · +1h 11madds 1h 51m over this leg · 34 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن20:29→09:55 +1d13h 26mno delay figure yetadds 1h 59m over this leg · 35 runs
- Karakoram Express 42DN42قراقرم ایکسپریس 42 ڈائون21:47→10:15 +1d12h 28mno delay figure yetadds 1h 56m over this leg · 26 runs
- Pak Business 34DN34پاک بزنس 34 ڈائون22:14→11:01 +1d12h 47mno delay figure yetadds 1h 42m over this leg · 36 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون22:54→12:06 +1d13h 12m8% on time · +2h 35madds 1h 58m over this leg · 38 runs
Travelling the other way? Drigh Road to Bahawalpur trains →
Common questions
How many trains run from Bahawalpur to Drigh Road?
17 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Bahawalpur to Drigh Road?
Shah Hussain Express 44DN, booked at 11h 57m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Bahawalpur to Drigh Road is most likely to be on time?
Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 39% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 27 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 9 of 17 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Bahawalpur to Drigh Road?
Yes. 11 of the 17 scheduled services are booked to arrive on a later day than they depart: Hazara Express 12DN, Shalimar Express 28DN, Khyber Mail 2DN, Fareed Express 38DN and others.
Do trains lose time between Bahawalpur and Drigh Road?
Typically yes. Rehman Baba Express 48DN adds about 2h 16m to its delay over this leg, measured across 36 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Bahawalpur to Drigh Road by train?
It is between 813 and 821 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 12 of the 17 services; the rest of the track on this route has not been traced yet.
Are these Bahawalpur to Drigh Road timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.