Bahawalpur to Drigh Road
Green Line 6DN — within 15 minutes of the scheduled time 36% of the time, typically 58 minutes late, over 26 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Bahawalpur to Drigh Road it typically adds 1h 20m, from 60 recorded runs. At Drigh Road it has typically arrived 141 minutes late, from 87 recorded runs.
Every train, compared
14 of 16 with 7+ daysOver this leg is the CHANGE in a train's delay between Bahawalpur and Drigh Road on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Bahawalpur — no booked arrival at Bahawalpur to measure from at all. Figures cover runs recorded between 30 July 2026 and 19 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 16Karachi Express 16DN | 00:20 +1d | 13:05 +1d | 12h 45m | not measured yet | +2h 40m | 8% | adds 1h 08m · 60 |
| 36Sir Sayyed Express 36DN | 00:50 +1d | 13:25 +1d | 12h 35m | not measured yet | — | — | no data |
| 6Green Line 6DN | 01:40 +1d | 13:50 +1d | 12h 10m | 814 km | +58 min | 36% | adds 1h 20m · 60 |
| 14Awam Express 14DN | 02:25 +1d | 18:41 +1d | 16h 16m | not measured yet | +1h 23m | 15% | adds 57 min · 51 |
| 48Rehman Baba Express 48DN | 02:45 +1d | 16:23 +1d | 13h 38m | not measured yet | +2h 22m | 10% | adds 1h 55m · 60 |
| 44Shah Hussain Express 44DN | 03:36 +1d | 15:33 +1d | 11h 57m | not measured yet | — | — | no data |
| 12Hazara Express 12DN | 08:45 +1d | 00:00 +2d | 15h 15m | not measured yet | +1h 38m | 14% | adds 18 min · 60 |
| 2Khyber Mail 2DN | 15:15 +1d | 05:48 +2d | 14h 33m | not measured yet | +1h 59m | 7% | adds 1h 36m · 31 |
| 38Fareed Express 38DN | 16:18 | 07:16 +1d | 14h 58m | not measured yet | +1h 04m | 16% | adds 50 min · 52 |
| 26Bahauddin Zikria Express 26DN | 17:50 | 08:02 +1d | 14h 12m | not measured yet | +1h 34m | 9% | adds 1h 30m · 42 |
| 46Pakistan Express 46DN | 18:55 | 08:18 +1d | 13h 23m | not measured yet | +2h 31m | 4% | adds 1h 52m · 57 |
| 10Allama Iqbal Express 10DN | 19:20 | 08:48 +1d | 13h 28m | not measured yet | +45 min | 27% | adds 1h 46m · 57 |
| 18Millat Express 18DN | 20:17 | 09:28 +1d | 13h 11m | not measured yet | +1h 04m | 30% | adds 1h 40m · 51 |
| 8Tezgam 8DN | 20:29 | 09:55 +1d | 13h 26m | not measured yet | +1h 09m | 16% | adds 1h 59m · 56 |
| 34Pak Business 34DN | 20:54 | 09:55 +1d | 13h 01m | not measured yet | +2h 28m | 9% | adds 1h 37m · 55 |
| 42Karakoram Express 42DN | 22:54 | 11:26 +1d | 12h 32m | not measured yet | +1h 29m | 19% | adds 1h 42m · 49 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Karachi Express 16DN16کراچی ایکسپریس 16 ڈائون00:20 +1d→13:05 +1d12h 45m8% on time · +2h 40madds 1h 08m over this leg · 60 runs
- Sir Sayyed Express 36DN36سر سید ایکپریس 36 ڈاؤن00:50 +1d→13:25 +1d12h 35mno delay figure yetno data over this leg
- Green Line 6DN6گرين لائن 6 ڈاؤن01:40 +1d→13:50 +1d12h 10m36% on time · +58 minadds 1h 20m over this leg · 60 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون02:25 +1d→18:41 +1d16h 16m15% on time · +1h 23madds 57 min over this leg · 51 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن02:45 +1d→16:23 +1d13h 38m10% on time · +2h 22madds 1h 55m over this leg · 60 runs
- Shah Hussain Express 44DN44شاہ حسین ایکسپریس 44 ڈاؤن03:36 +1d→15:33 +1d11h 57mno delay figure yetno data over this leg
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن08:45 +1d→00:00 +2d15h 15m14% on time · +1h 38madds 18 min over this leg · 60 runs
- Khyber Mail 2DN2خیبر میل 2 ڈائون15:15 +1d→05:48 +2d14h 33m7% on time · +1h 59madds 1h 36m over this leg · 31 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون16:18→07:16 +1d14h 58m16% on time · +1h 04madds 50 min over this leg · 52 runs
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون17:50→08:02 +1d14h 12m9% on time · +1h 34madds 1h 30m over this leg · 42 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون18:55→08:18 +1d13h 23m4% on time · +2h 31madds 1h 52m over this leg · 57 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون19:20→08:48 +1d13h 28m27% on time · +45 minadds 1h 46m over this leg · 57 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون20:17→09:28 +1d13h 11m30% on time · +1h 04madds 1h 40m over this leg · 51 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن20:29→09:55 +1d13h 26m16% on time · +1h 09madds 1h 59m over this leg · 56 runs
- Pak Business 34DN34پاک بزنس 34 ڈائون20:54→09:55 +1d13h 01m9% on time · +2h 28madds 1h 37m over this leg · 55 runs
- Karakoram Express 42DN42قراقرم ایکسپریس 42 ڈائون22:54→11:26 +1d12h 32m19% on time · +1h 29madds 1h 42m over this leg · 49 runs
Travelling the other way? Drigh Road to Bahawalpur trains →
Common questions
How many trains run from Bahawalpur to Drigh Road?
16 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Bahawalpur to Drigh Road?
Shah Hussain Express 44DN, booked at 11h 57m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Bahawalpur to Drigh Road is most likely to be on time?
Green Line 6DN has the best recorded punctuality of the services we hold enough history for: 36% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 58 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 14 of 16 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Bahawalpur to Drigh Road?
Yes. 10 of the 16 scheduled services are booked to arrive on a later day than they depart: Hazara Express 12DN, Khyber Mail 2DN, Fareed Express 38DN, Bahauddin Zikria Express 26DN and others.
Do trains lose time between Bahawalpur and Drigh Road?
Typically yes. Tezgam 8DN adds about 1h 59m to its delay over this leg, measured across 56 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Bahawalpur to Drigh Road by train?
It is about 814 km along the track. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 1 of the 16 services; the rest of the track on this route has not been traced yet.
Are these Bahawalpur to Drigh Road timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.