Bahawalpur to Hyderabad Jn
Shalimar Express 28DN — within 15 minutes of the scheduled time 44% of the time, typically 22 minutes late, over 10 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Bahawalpur to Hyderabad Jn it typically adds 29 min, from 23 recorded runs. At Hyderabad Jn it has typically arrived 40 minutes late, from 35 recorded runs.
Every train, compared
14 of 17 with 7+ daysOver this leg is the CHANGE in a train's delay between Bahawalpur and Hyderabad Jn on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Bahawalpur — no booked arrival at Bahawalpur to measure from at all. Figures cover runs recorded between 30 July 2026 and 7 October 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 16Karachi Express 16DN | 00:20 +1d | 10:15 +1d | 9h 55m | 653 km | +2h 05m | 13% | adds 40 min · 37 |
| 36Sir Sayyed Express 36DN | 00:50 +1d | 10:40 +1d | 9h 50m | not measured yet | — | — | no data |
| 6Green Line 6DN | 01:40 +1d | 11:15 +1d | 9h 35m | 652 km | +45 min | 35% | adds 53 min · 38 |
| 14Awam Express 14DN | 02:14 +1d | 15:55 +1d | 13h 41m | 657 km | +2h 09m | 8% | adds 18 min · 38 |
| 48Rehman Baba Express 48DN | 02:45 +1d | 13:45 +1d | 11h | 654 km | +2h 20m | 13% | adds 1h 19m · 36 |
| 44Shah Hussain Express 44DN | 03:36 +1d | 13:05 +1d | 9h 29m | not measured yet | — | — | no data |
| 12Hazara Express 12DN | 08:45 +1d | 21:05 +1d | 12h 20m | 656 km | +1h 17m | 10% | makes up 2 min · 34 |
| 28Shalimar Express 28DN | 14:27 | 00:05 +1d | 9h 38m | not measured yet | +22 min | 44% | adds 29 min · 23 |
| 2Khyber Mail 2DN | 15:00 +1d | 02:00 +2d | 11h | 658 km | +2h 02m | 7% | adds 1h 14m · 22 |
| 38Fareed Express 38DN | 16:18 | 04:25 +1d | 12h 07m | not measured yet | +44 min | 14% | adds 5 min · 28 |
| 26Bahauddin Zikria Express 26DN | 17:50 | 05:10 +1d | 11h 20m | 655 km | +1h 10m | 10% | adds 45 min · 21 |
| 46Pakistan Express 46DN | 18:55 | 05:35 +1d | 10h 40m | 652 km | +1h 02m | 5% | adds 1h 24m · 36 |
| 10Allama Iqbal Express 10DN | 19:20 | 06:00 +1d | 10h 40m | 653 km | +53 min | 24% | adds 1h 25m · 36 |
| 8Tezgam 8DN | 20:29 | 07:10 +1d | 10h 41m | 650 km | +58 min | 17% | adds 1h 33m · 34 |
| 42Karakoram Express 42DN | 21:47 | 07:30 +1d | 9h 43m | not measured yet | — | — | adds 1h 08m · 26 |
| 34Pak Business 34DN | 22:14 | 08:15 +1d | 10h 01m | 650 km | +1h 05m | 18% | adds 1h 10m · 36 |
| 18Millat Express 18DN | 22:54 | 09:30 +1d | 10h 36m | 653 km | +2h 37m | 10% | adds 1h 19m · 38 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Karachi Express 16DN16کراچی ایکسپریس 16 ڈائون00:20 +1d→10:15 +1d9h 55m13% on time · +2h 05madds 40 min over this leg · 37 runs
- Sir Sayyed Express 36DN36سر سید ایکپریس 36 ڈاؤن00:50 +1d→10:40 +1d9h 50mno delay figure yetno data over this leg
- Green Line 6DN6گرين لائن 6 ڈاؤن01:40 +1d→11:15 +1d9h 35m35% on time · +45 minadds 53 min over this leg · 38 runs
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون02:14 +1d→15:55 +1d13h 41m8% on time · +2h 09madds 18 min over this leg · 38 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن02:45 +1d→13:45 +1d11h13% on time · +2h 20madds 1h 19m over this leg · 36 runs
- Shah Hussain Express 44DN44شاہ حسین ایکسپریس 44 ڈاؤن03:36 +1d→13:05 +1d9h 29mno delay figure yetno data over this leg
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن08:45 +1d→21:05 +1d12h 20m10% on time · +1h 17mmakes up 2 min over this leg · 34 runs
- Shalimar Express 28DN28شالیمار ایکسپریس 28 ڈائون14:27→00:05 +1d9h 38m44% on time · +22 minadds 29 min over this leg · 23 runs
- Khyber Mail 2DN2خیبر میل 2 ڈائون15:00 +1d→02:00 +2d11h7% on time · +2h 02madds 1h 14m over this leg · 22 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون16:18→04:25 +1d12h 07m14% on time · +44 minadds 5 min over this leg · 28 runs
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون17:50→05:10 +1d11h 20m10% on time · +1h 10madds 45 min over this leg · 21 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون18:55→05:35 +1d10h 40m5% on time · +1h 02madds 1h 24m over this leg · 36 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون19:20→06:00 +1d10h 40m24% on time · +53 minadds 1h 25m over this leg · 36 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن20:29→07:10 +1d10h 41m17% on time · +58 minadds 1h 33m over this leg · 34 runs
- Karakoram Express 42DN42قراقرم ایکسپریس 42 ڈائون21:47→07:30 +1d9h 43mno delay figure yetadds 1h 08m over this leg · 26 runs
- Pak Business 34DN34پاک بزنس 34 ڈائون22:14→08:15 +1d10h 01m18% on time · +1h 05madds 1h 10m over this leg · 36 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون22:54→09:30 +1d10h 36m10% on time · +2h 37madds 1h 19m over this leg · 38 runs
Travelling the other way? Hyderabad Jn to Bahawalpur trains →
Common questions
How many trains run from Bahawalpur to Hyderabad Jn?
17 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Bahawalpur to Hyderabad Jn?
Shah Hussain Express 44DN, booked at 9h 29m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Bahawalpur to Hyderabad Jn is most likely to be on time?
Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 44% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 22 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 14 of 17 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Bahawalpur to Hyderabad Jn?
Yes. 10 of the 17 scheduled services are booked to arrive on a later day than they depart: Shalimar Express 28DN, Khyber Mail 2DN, Fareed Express 38DN, Bahauddin Zikria Express 26DN and others.
Do trains lose time between Bahawalpur and Hyderabad Jn?
Typically yes. Tezgam 8DN adds about 1h 33m to its delay over this leg, measured across 34 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Bahawalpur to Hyderabad Jn by train?
It is between 650 and 658 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 12 of the 17 services; the rest of the track on this route has not been traced yet.
Are these Bahawalpur to Hyderabad Jn timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.