latetrains.pkLate, on recordTrain delays · independent
Stations/Bahawalpur/Bahawalpur → Rohri Jn.

Bahawalpur to Rohri Jn.

18 scheduled services · fastest about 4h 30m · 353 km (measured on 1 of 18)
Bahawalpur se Rohri ki train — timing aur delay record.
18Scheduled services
4h 30mFastest booked
6h 30mSlowest booked
7Overnight services
16 of 18With a delay record
BAHAWALPURROHRIBAHAWALPUR
بہاولپور ۔ روہڑی جنکشن ۔ بہاولپور
Most reliable choice

Shalimar Express 28DN — within 15 minutes of the scheduled time 39% of the time, typically 27 minutes late, over 25 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Bahawalpur to Rohri Jn. it typically adds 17 min, from 40 recorded runs. At Rohri Jn. it has typically arrived 18 minutes late, from 77 recorded runs.

Every train, compared

16 of 18 with 7+ days

Over this leg is the CHANGE in a train's delay between Bahawalpur and Rohri Jn. on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Bahawalpur — no booked arrival at Bahawalpur to measure from at all. Figures cover runs recorded between 30 July 2026 and 19 November 2026. why a delay figure changes along the route.

TrainDepartsArrivesDurationDistanceTypical delayOn-timeOver this leg
16Karachi Express 16DN00:20 +1d05:00 +1d4h 40mnot measured yet+2h 41m8%adds 16 min · 59
36Sir Sayyed Express 36DN00:50 +1d05:35 +1d4h 45mnot measured yet——no data
6Green Line 6DN01:40 +1d06:10 +1d4h 30m353 km+52 min36%adds 11 min · 61
14Awam Express 14DN02:25 +1d08:55 +1d6h 30mnot measured yet+1h 22m15%adds 2 min · 52
48Rehman Baba Express 48DN02:45 +1d07:40 +1d4h 55mnot measured yet+2h 21m10%adds 58 min · 60
44Shah Hussain Express 44DN03:36 +1d08:10 +1d4h 34mnot measured yet——no data
12Hazara Express 12DN08:45 +1d14:55 +1d6h 10mnot measured yet+1h 32m15%no change · 60
28Shalimar Express 28DN14:2719:004h 33mnot measured yet+27 min39%adds 17 min · 40
2Khyber Mail 2DN15:15 +1d21:40 +1d6h 25mnot measured yet+1h 58m8%adds 15 min · 31
38Fareed Express 38DN16:1822:356h 17mnot measured yet+1h 05m16%adds 1 min · 51
26Bahauddin Zikria Express 26DN17:5023:355h 45mnot measured yet+1h 33m10%adds 32 min · 41
46Pakistan Express 46DN18:5500:10 +1d5h 15mnot measured yet+2h 26m4%adds 38 min · 60
10Allama Iqbal Express 10DN19:2000:25 +1d5h 05mnot measured yet+44 min28%adds 35 min · 59
18Millat Express 18DN20:1701:10 +1d4h 53mnot measured yet+1h31%adds 35 min · 53
8Tezgam 8DN20:2901:30 +1d5h 01mnot measured yet+1h 08m17%adds 40 min · 58
34Pak Business 34DN20:5401:55 +1d5h 01mnot measured yet+2h 28m9%adds 31 min · 56
40Jaffar Express 40DN22:2803:35 +1d5h 07mnot measured yet+52 min20%adds 19 min · 35
42Karakoram Express 42DN22:5403:45 +1d4h 51mnot measured yet+1h 32m20%adds 34 min · 51
What the marks mean
  • Departs · Arrives — scheduled local times, published Pakistan Railways timetable
  • +1d — a stop on a later day of the train's own run, not a date
  • Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
  • — — fewer than 7 days of recorded runs for that train
  • Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
  • A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
  • — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.

Every service in detail

Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.

Travelling the other way? Rohri Jn. to Bahawalpur trains →

Common questions

How many trains run from Bahawalpur to Rohri Jn.?

18 scheduled services on the current published timetable. That is what is booked to run, not what ran today.

Which is the fastest train from Bahawalpur to Rohri Jn.?

Green Line 6DN, booked at 4h 30m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.

Which train from Bahawalpur to Rohri Jn. is most likely to be on time?

Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 39% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 27 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 16 of 18 services on this route currently have enough recorded history to rank at all.

Is there an overnight train from Bahawalpur to Rohri Jn.?

Yes. 7 of the 18 scheduled services are booked to arrive on a later day than they depart: Pakistan Express 46DN, Allama Iqbal Express 10DN, Millat Express 18DN, Tezgam 8DN and others.

Do trains lose time between Bahawalpur and Rohri Jn.?

Typically yes. Rehman Baba Express 48DN adds about 58 min to its delay over this leg, measured across 60 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.

How far is it from Bahawalpur to Rohri Jn. by train?

It is about 353 km along the track. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 1 of the 18 services; the rest of the track on this route has not been traced yet.

Are these Bahawalpur to Rohri Jn. timings the real arrival times?

No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.

Stations on this line

13 stops
BahawalpurSamasata JnMubarakpurDera Nawab SahibLiaquatpurKhanpur Jn.Rahim Yar KhanSadiqabadDaharkiMirpur MatheloGhotkiPano AkilRohri Jn.
direct services only
Bahawalpur → Karachi Cantt 14 trainsBahawalpur → Lahore Jn. 6 trainsBahawalpur → Peshawar Cantt 4 trainsBahawalpur → Karachi City 3 trainsBahawalpur → Rawalpindi 3 trainsRohri Jn. → Karachi Cantt 14 trains

Bahawalpur timetable · Rohri Jn. timetable