Hazara Express 11UP — within 15 minutes of the scheduled time 27% of the time, typically 45 minutes late, over 12 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Rohri Jn. to Bahawalpur it typically adds 11 min, from 35 recorded runs. At Bahawalpur it has typically arrived 62 minutes late, from 46 recorded runs.
Every train, compared
15 of 18 with 7+ daysOver this leg is the CHANGE in a train's delay between Rohri Jn. and Bahawalpur on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rohri Jn. — no booked arrival at Rohri Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 7 October 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 9Allama Iqbal Express 9UP | 00:05 +1d | 05:36 +1d | 5h 31m | 353 km | +2h 52m | 5% | adds 44 min · 36 |
| 17Millat Express 17UP | 01:05 +1d | 06:50 +1d | 5h 45m | 353 km | +3h 35m | 0% | adds 6 min · 39 |
| 15Karachi Express 15UP | 01:35 +1d | 06:30 +1d | 4h 55m | 353 km | +1h 45m | 10% | adds 39 min · 36 |
| 7Tezgam 7UP | 02:00 +1d | 07:16 +1d | 5h 16m | 351 km | +1h 59m | 5% | adds 36 min · 35 |
| 25Bahauddin Zikria Express 25UP | 03:05 +1d | 08:41 +1d | 5h 36m | 355 km | +1h 52m | 5% | adds 57 min · 22 |
| 43Shah Hussain Express 43UP | 04:10 +1d | 09:03 +1d | 4h 53m | 353 km | — | — | no data |
| 35Sir Sayyed Express 35UP | 04:35 +1d | 09:30 +1d | 4h 55m | 353 km | — | — | no data |
| 37Fareed Express 37UP | 05:00 +1d | 11:55 +1d | 6h 55m | 355 km | +1h 19m | 8% | adds 20 min · 28 |
| 5Green Line 5UP | 05:25 +1d | 10:20 +1d | 4h 55m | 353 km | +41 min | 27% | adds 27 min · 38 |
| 1Khyber Mail 1UP | 05:55 +1d | 11:55 +1d | 6h | 357 km | +1h 39m | 9% | adds 1h 23m · 33 |
| 27Shalimar Express 27UP | 14:00 | 18:39 | 4h 39m | 358 km | +59 min | 21% | adds 53 min · 24 |
| 11Hazara Express 11UP | 16:00 | 22:22 | 6h 22m | 355 km | +45 min | 27% | adds 11 min · 35 |
| 13Awam Express 13UP | 17:20 | 23:54 | 6h 34m | 357 km | +1h 42m | 6% | adds 29 min · 38 |
| 47Rehman Baba Express 47UP | 20:40 | 01:55 +1d | 5h 15m | 354 km | +1h 43m | 10% | adds 57 min · 33 |
| 39Jaffar Express 39UP | 20:50 | 02:30 +1d | 5h 40m | not measured yet | +1h 55m | 0% | adds 11 min · 16 |
| 45Pakistan Express 45UP | 22:00 | 03:50 +1d | 5h 50m | 353 km | +2h 25m | 2% | adds 24 min · 37 |
| 41Karakoram Express 41UP | 22:25 | 03:20 +1d | 4h 55m | 353 km | — | — | adds 38 min · 29 |
| 33Pak Business 33UP | 23:35 | 04:43 +1d | 5h 08m | 350 km | +2h 01m | 10% | adds 28 min · 38 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Allama Iqbal Express 9UP9علامہ اقبال ایکسپریس 9 اپ00:05 +1d→05:36 +1d5h 31m5% on time · +2h 52madds 44 min over this leg · 36 runs
- Millat Express 17UP17ملت ایکسپریس 17 اپ01:05 +1d→06:50 +1d5h 45m0% on time · +3h 35madds 6 min over this leg · 39 runs
- Karachi Express 15UP15کراچی ایکسپریس 15 اپ01:35 +1d→06:30 +1d4h 55m10% on time · +1h 45madds 39 min over this leg · 36 runs
- Tezgam 7UP7تيزگام 7 اپ02:00 +1d→07:16 +1d5h 16m5% on time · +1h 59madds 36 min over this leg · 35 runs
- Bahauddin Zikria Express 25UP25بہائو الدین زکریا ایکسپری25 اپ03:05 +1d→08:41 +1d5h 36m5% on time · +1h 52madds 57 min over this leg · 22 runs
- Shah Hussain Express 43UP43شاہ حسین ایکسپریس 43اپ04:10 +1d→09:03 +1d4h 53mno delay figure yetno data over this leg
- Sir Sayyed Express 35UP35سر سید ایکپریس 35اپ04:35 +1d→09:30 +1d4h 55mno delay figure yetno data over this leg
- Fareed Express 37UP37فرید ایکسپریس 37 اپ05:00 +1d→11:55 +1d6h 55m8% on time · +1h 19madds 20 min over this leg · 28 runs
- Green Line 5UP5گرين لائن5 اپ05:25 +1d→10:20 +1d4h 55m27% on time · +41 minadds 27 min over this leg · 38 runs
- Khyber Mail 1UP1خیبر میل 1 اپ05:55 +1d→11:55 +1d6h9% on time · +1h 39madds 1h 23m over this leg · 33 runs
- Shalimar Express 27UP27شالیمار ایکسپریس 27 اپ14:00→18:394h 39m21% on time · +59 minadds 53 min over this leg · 24 runs
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ16:00→22:226h 22m27% on time · +45 minadds 11 min over this leg · 35 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ17:20→23:546h 34m6% on time · +1h 42madds 29 min over this leg · 38 runs
- Rehman Baba Express 47UP47رحمان بابا ایکسپریس47اپ20:40→01:55 +1d5h 15m10% on time · +1h 43madds 57 min over this leg · 33 runs
- Jaffar Express 39UP39جعفر ایکسپریس 39 اپ20:50→02:30 +1d5h 40m0% on time · +1h 55madds 11 min over this leg · 16 runs
- Pakistan Express 45UP45پاکستان ایکسپریس 45 اپ22:00→03:50 +1d5h 50m2% on time · +2h 25madds 24 min over this leg · 37 runs
- Karakoram Express 41UP41قراقرم ایکسپریس 41 اپ22:25→03:20 +1d4h 55mno delay figure yetadds 38 min over this leg · 29 runs
- Pak Business 33UP33پاک بزنس 33 اپ23:35→04:43 +1d5h 08m10% on time · +2h 01madds 28 min over this leg · 38 runs
Travelling the other way? Bahawalpur to Rohri Jn. trains →
Common questions
How many trains run from Rohri Jn. to Bahawalpur?
18 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rohri Jn. to Bahawalpur?
Shalimar Express 27UP, booked at 4h 39m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rohri Jn. to Bahawalpur is most likely to be on time?
Hazara Express 11UP has the best recorded punctuality of the services we hold enough history for: 27% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 45 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 15 of 18 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rohri Jn. to Bahawalpur?
Yes. 5 of the 18 scheduled services are booked to arrive on a later day than they depart: Rehman Baba Express 47UP, Jaffar Express 39UP, Pakistan Express 45UP, Karakoram Express 41UP and others.
Do trains lose time between Rohri Jn. and Bahawalpur?
Typically yes. Khyber Mail 1UP adds about 1h 23m to its delay over this leg, measured across 33 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Rohri Jn. to Bahawalpur by train?
It is between 350 and 358 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 17 of the 18 services; the rest of the track on this route has not been traced yet.
Are these Rohri Jn. to Bahawalpur timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.