Awam Express 13UP — within 15 minutes of the scheduled time 13% of the time, typically 89 minutes late, over 25 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Hyderabad Jn to Lala Musa Jn. it typically adds 1h 37m, from 51 recorded runs. At Lala Musa Jn. it has typically arrived 142 minutes late, from 85 recorded runs.
Every train, compared
7 of 7 with 7+ daysOver this leg is the CHANGE in a train's delay between Hyderabad Jn and Lala Musa Jn. on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Hyderabad Jn — no booked arrival at Hyderabad Jn to measure from at all. Figures cover runs recorded between 30 July 2026 and 19 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|
| 1Khyber Mail 1UP | 01:15 +1d | 23:22 +1d | 22h 07m | +2h 19m | 3% | adds 3h 29m · 33 |
| 13Awam Express 13UP | 10:20 | 09:45 +1d | 23h 25m | +1h 29m | 13% | adds 1h 37m · 51 |
| 11Hazara Express 11UP | 11:20 | 11:15 +1d | 23h 55m | +1h 31m | 11% | adds 1h 35m · 50 |
| 47Rehman Baba Express 47UP | 14:55 | 11:27 +1d | 20h 32m | +1h 39m | 9% | adds 1h 44m · 62 |
| 45Pakistan Express 45UP | 16:48 | 14:10 +1d | 21h 22m | +4h 35m | 1% | adds 1h 17m · 35 |
| 17Millat Express 17UP | 19:25 | 17:45 +1d | 22h 20m | +1h 44m | 7% | adds 22 min · 21 |
| 7Tezgam 7UP | 20:10 | 16:47 +1d | 20h 37m | +2h 17m | 3% | adds 2h 38m · 58 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Khyber Mail 1UP1خیبر میل 1 اپ01:15 +1d→23:22 +1d22h 07m3% on time · +2h 19madds 3h 29m over this leg · 33 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ10:20→09:45 +1d23h 25m13% on time · +1h 29madds 1h 37m over this leg · 51 runs
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ11:20→11:15 +1d23h 55m11% on time · +1h 31madds 1h 35m over this leg · 50 runs
- Rehman Baba Express 47UP47رحمان بابا ایکسپریس47اپ14:55→11:27 +1d20h 32m9% on time · +1h 39madds 1h 44m over this leg · 62 runs
- Pakistan Express 45UP45پاکستان ایکسپریس 45 اپ16:48→14:10 +1d21h 22m1% on time · +4h 35madds 1h 17m over this leg · 35 runs
- Millat Express 17UP17ملت ایکسپریس 17 اپ19:25→17:45 +1d22h 20m7% on time · +1h 44madds 22 min over this leg · 21 runs
- Tezgam 7UP7تيزگام 7 اپ20:10→16:47 +1d20h 37m3% on time · +2h 17madds 2h 38m over this leg · 58 runs
Travelling the other way? Lala Musa Jn. to Hyderabad Jn trains →
Common questions
How many trains run from Hyderabad Jn to Lala Musa Jn.?
7 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Hyderabad Jn to Lala Musa Jn.?
Rehman Baba Express 47UP, booked at 20h 32m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Hyderabad Jn to Lala Musa Jn. is most likely to be on time?
Awam Express 13UP has the best recorded punctuality of the services we hold enough history for: 13% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 1h 29m. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 7 of 7 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Hyderabad Jn to Lala Musa Jn.?
Yes. 6 of the 7 scheduled services are booked to arrive on a later day than they depart: Awam Express 13UP, Hazara Express 11UP, Rehman Baba Express 47UP, Pakistan Express 45UP and others.
Do trains lose time between Hyderabad Jn and Lala Musa Jn.?
Typically yes. Khyber Mail 1UP adds about 3h 29m to its delay over this leg, measured across 33 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
Are these Hyderabad Jn to Lala Musa Jn. timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.