Awam Express 13UP — within 15 minutes of the scheduled time 13% of the time, typically 89 minutes late, over 25 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Hyderabad Jn to Raiwind Jn. it typically adds 1h 02m, from 54 recorded runs. At Raiwind Jn. it has typically arrived 117 minutes late, from 88 recorded runs.
Every train, compared
7 of 7 with 7+ daysOver this leg is the CHANGE in a train's delay between Hyderabad Jn and Raiwind Jn. on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Hyderabad Jn — no booked arrival at Hyderabad Jn to measure from at all. Figures cover runs recorded between 30 July 2026 and 19 November 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|
| 1Khyber Mail 1UP | 01:15 +1d | 19:15 +1d | 18h | +2h 19m | 3% | adds 3h 01m · 40 |
| 13Awam Express 13UP | 10:20 | 05:40 +1d | 19h 20m | +1h 29m | 13% | adds 1h 02m · 54 |
| 33Pak Business 33UP | 17:40 | 07:56 +1d | 14h 16m | +3h 03m | 6% | adds 1h 19m · 56 |
| 9Allama Iqbal Express 9UP | 18:20 | 11:25 +1d | 17h 05m | +2h 45m | 3% | adds 1h 38m · 60 |
| 7Tezgam 7UP | 20:10 | 13:00 +1d | 16h 50m | +2h 17m | 3% | adds 1h 25m · 58 |
| 15Karachi Express 15UP | 20:40 | 11:50 +1d | 15h 10m | +1h 53m | 8% | adds 1h 35m · 59 |
| 37Fareed Express 37UP | 23:00 | 21:10 +1d | 22h 10m | +1h 44m | 8% | adds 51 min · 51 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Khyber Mail 1UP1خیبر میل 1 اپ01:15 +1d→19:15 +1d18h3% on time · +2h 19madds 3h 01m over this leg · 40 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ10:20→05:40 +1d19h 20m13% on time · +1h 29madds 1h 02m over this leg · 54 runs
- Pak Business 33UP33پاک بزنس 33 اپ17:40→07:56 +1d14h 16m6% on time · +3h 03madds 1h 19m over this leg · 56 runs
- Allama Iqbal Express 9UP9علامہ اقبال ایکسپریس 9 اپ18:20→11:25 +1d17h 05m3% on time · +2h 45madds 1h 38m over this leg · 60 runs
- Tezgam 7UP7تيزگام 7 اپ20:10→13:00 +1d16h 50m3% on time · +2h 17madds 1h 25m over this leg · 58 runs
- Karachi Express 15UP15کراچی ایکسپریس 15 اپ20:40→11:50 +1d15h 10m8% on time · +1h 53madds 1h 35m over this leg · 59 runs
- Fareed Express 37UP37فرید ایکسپریس 37 اپ23:00→21:10 +1d22h 10m8% on time · +1h 44madds 51 min over this leg · 51 runs
Travelling the other way? Raiwind Jn. to Hyderabad Jn trains →
Common questions
How many trains run from Hyderabad Jn to Raiwind Jn.?
7 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Hyderabad Jn to Raiwind Jn.?
Pak Business 33UP, booked at 14h 16m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Hyderabad Jn to Raiwind Jn. is most likely to be on time?
Awam Express 13UP has the best recorded punctuality of the services we hold enough history for: 13% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 1h 29m. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 7 of 7 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Hyderabad Jn to Raiwind Jn.?
Yes. 6 of the 7 scheduled services are booked to arrive on a later day than they depart: Awam Express 13UP, Pak Business 33UP, Allama Iqbal Express 9UP, Tezgam 7UP and others.
Do trains lose time between Hyderabad Jn and Raiwind Jn.?
Typically yes. Khyber Mail 1UP adds about 3h 01m to its delay over this leg, measured across 40 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
Are these Hyderabad Jn to Raiwind Jn. timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.