Shalimar Express 28DN — within 15 minutes of the scheduled time 44% of the time, typically 22 minutes late, over 10 days of recorded runs across every stop of its full journey, not this segment alone.
Every train, compared
12 of 15 with 7+ daysOver this leg is the CHANGE in a train's delay between Khanewal Jn and Drigh Road on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Khanewal Jn — no booked arrival at Khanewal Jn to measure from at all. Figures cover runs recorded between 30 July 2026 and 7 October 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 6Green Line 6DN | 00:25 +1d | 13:50 +1d | 13h 25m | 921 km | +45 min | 35% | adds 1h 45m · 39 |
| 48Rehman Baba Express 48DN | 00:27 +1d | 16:23 +1d | 15h 56m | 969 km | +2h 20m | 13% | adds 2h 39m · 37 |
| 44Shah Hussain Express 44DN | 02:10 +1d | 15:33 +1d | 13h 23m | not measured yet | — | — | no data |
| 12Hazara Express 12DN | 06:00 +1d | 00:00 +2d | 18h | 972 km | +1h 17m | 10% | adds 36 min · 23 |
| 2Khyber Mail 2DN | 12:40 +1d | 04:45 +2d | 16h 05m | 975 km | +2h 02m | 7% | adds 2h 19m · 21 |
| 46Pakistan Express 46DN | 16:35 | 08:18 +1d | 15h 43m | 967 km | +1h 02m | 5% | adds 2h 35m · 36 |
| 10Allama Iqbal Express 10DN | 17:25 | 08:48 +1d | 15h 23m | 927 km | +53 min | 24% | adds 2h 06m · 35 |
| 8Tezgam 8DN | 18:15 | 09:55 +1d | 15h 40m | 965 km | +58 min | 17% | adds 2h 23m · 35 |
| 42Karakoram Express 42DN | 20:25 | 10:15 +1d | 13h 50m | not measured yet | — | — | adds 2h 32m · 26 |
| 34Pak Business 34DN | 20:50 | 11:01 +1d | 14h 11m | 920 km | +1h 05m | 18% | adds 2h 08m · 33 |
| 18Millat Express 18DN | 21:05 | 12:06 +1d | 15h 01m | 925 km | +2h 37m | 10% | adds 2h 13m · 36 |
| 16Karachi Express 16DN | 22:00 | 13:05 +1d | 15h 05m | 968 km | +2h 05m | 13% | adds 1h 31m · 38 |
| 36Sir Sayyed Express 36DN | 23:25 | 13:25 +1d | 14h | not measured yet | — | — | no data |
| 14Awam Express 14DN | 23:50 | 18:54 +1d | 19h 04m | 975 km | +2h 09m | 8% | adds 1h 45m · 38 |
| 28Shalimar Express 28DN | — | — +1d | — | not measured yet | +22 min | 44% | no data |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Green Line 6DN6گرين لائن 6 ڈاؤن00:25 +1d→13:50 +1d13h 25m35% on time · +45 minadds 1h 45m over this leg · 39 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن00:27 +1d→16:23 +1d15h 56m13% on time · +2h 20madds 2h 39m over this leg · 37 runs
- Shah Hussain Express 44DN44شاہ حسین ایکسپریس 44 ڈاؤن02:10 +1d→15:33 +1d13h 23mno delay figure yetno data over this leg
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن06:00 +1d→00:00 +2d18h10% on time · +1h 17madds 36 min over this leg · 23 runs
- Khyber Mail 2DN2خیبر میل 2 ڈائون12:40 +1d→04:45 +2d16h 05m7% on time · +2h 02madds 2h 19m over this leg · 21 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون16:35→08:18 +1d15h 43m5% on time · +1h 02madds 2h 35m over this leg · 36 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون17:25→08:48 +1d15h 23m24% on time · +53 minadds 2h 06m over this leg · 35 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن18:15→09:55 +1d15h 40m17% on time · +58 minadds 2h 23m over this leg · 35 runs
- Karakoram Express 42DN42قراقرم ایکسپریس 42 ڈائون20:25→10:15 +1d13h 50mno delay figure yetadds 2h 32m over this leg · 26 runs
- Pak Business 34DN34پاک بزنس 34 ڈائون20:50→11:01 +1d14h 11m18% on time · +1h 05madds 2h 08m over this leg · 33 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون21:05→12:06 +1d15h 01m10% on time · +2h 37madds 2h 13m over this leg · 36 runs
- Karachi Express 16DN16کراچی ایکسپریس 16 ڈائون22:00→13:05 +1d15h 05m13% on time · +2h 05madds 1h 31m over this leg · 38 runs
- Sir Sayyed Express 36DN36سر سید ایکپریس 36 ڈاؤن23:25→13:25 +1d14hno delay figure yetno data over this leg
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون23:50→18:54 +1d19h 04m8% on time · +2h 09madds 1h 45m over this leg · 38 runs
- Shalimar Express 28DN28شالیمار ایکسپریس 28 ڈائون—→— +1d—44% on time · +22 minno data over this leg
Travelling the other way? Drigh Road to Khanewal Jn trains →
Common questions
How many trains run from Khanewal Jn to Drigh Road?
15 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Khanewal Jn to Drigh Road?
Shah Hussain Express 44DN, booked at 13h 23m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Khanewal Jn to Drigh Road is most likely to be on time?
Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 44% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 22 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 12 of 15 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Khanewal Jn to Drigh Road?
Yes. 12 of the 15 scheduled services are booked to arrive on a later day than they depart: Hazara Express 12DN, Khyber Mail 2DN, Pakistan Express 46DN, Allama Iqbal Express 10DN and others.
Do trains lose time between Khanewal Jn and Drigh Road?
Typically yes. Rehman Baba Express 48DN adds about 2h 39m to its delay over this leg, measured across 37 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Khanewal Jn to Drigh Road by train?
It is between 920 and 975 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 11 of the 15 services; the rest of the track on this route has not been traced yet.
Are these Khanewal Jn to Drigh Road timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.