Shalimar Express 28DN — within 15 minutes of the scheduled time 39% of the time, typically 27 minutes late, over 7 days of recorded runs across every stop of its full journey, not this segment alone.
Every train, compared
9 of 18 with 7+ daysOver this leg is the CHANGE in a train's delay between Rohri Jn. and Drigh Road on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rohri Jn. — no booked arrival at Rohri Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 6 September 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 26Bahauddin Zikria Express 26DN | 00:01 +1d | 08:02 +1d | 8h 01m | 465 km | — | — | adds 1h 18m · 23 |
| 46Pakistan Express 46DN | 00:35 +1d | 08:18 +1d | 7h 43m | 462 km | +1h 04m | 4% | adds 1h 10m · 38 |
| 10Allama Iqbal Express 10DN | 00:50 +1d | 08:48 +1d | 7h 58m | 464 km | +1h 11m | 24% | adds 1h 11m · 35 |
| 8Tezgam 8DN | 01:55 +1d | 09:55 +1d | 8h | 462 km | — | — | adds 1h 15m · 37 |
| 42Karakoram Express 42DN | 02:50 +1d | 10:15 +1d | 7h 25m | not measured yet | — | — | adds 1h 10m · 29 |
| 34Pak Business 34DN | 03:25 +1d | 11:01 +1d | 7h 36m | 463 km | — | — | adds 55 min · 36 |
| 18Millat Express 18DN | 04:20 +1d | 12:06 +1d | 7h 46m | 462 km | +2h 35m | 8% | adds 1h 03m · 38 |
| 16Karachi Express 16DN | 05:25 +1d | 13:05 +1d | 7h 40m | 463 km | — | — | adds 43 min · 38 |
| 36Sir Sayyed Express 36DN | 06:00 +1d | 13:25 +1d | 7h 25m | not measured yet | — | — | no data |
| 6Green Line 6DN | 06:35 +1d | 13:50 +1d | 7h 15m | 462 km | +39 min | 36% | adds 1h 02m · 38 |
| 48Rehman Baba Express 48DN | 08:05 +1d | 16:23 +1d | 8h 18m | 463 km | +1h 56m | 14% | adds 52 min · 37 |
| 44Shah Hussain Express 44DN | 08:30 +1d | 15:33 +1d | 7h 03m | not measured yet | — | — | no data |
| 14Awam Express 14DN | 09:20 +1d | 18:54 +1d | 9h 34m | 464 km | +2h 14m | 8% | adds 1h 05m · 37 |
| 12Hazara Express 12DN | 15:20 +1d | 00:00 +2d | 8h 40m | 465 km | — | — | adds 12 min · 34 |
| 28Shalimar Express 28DN | 19:35 | — +1d | — | not measured yet | +27 min | 39% | no data |
| 146Sukkur Express 146DN | 21:30 | 07:03 +1d | 9h 33m | not measured yet | — | — | adds 1h 11m · 13 |
| 2Khyber Mail 2DN | 21:35 +1d | 04:45 +2d | 7h 10m | 463 km | +2h 12m | 8% | adds 1h 24m · 20 |
| 38Fareed Express 38DN | 23:00 | 07:16 +1d | 8h 16m | not measured yet | +44 min | 16% | adds 52 min · 29 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Bahauddin Zikria Express 26DN26بہائو الدین زکریا ایکسپریس26 ڈائون00:01 +1d→08:02 +1d8h 01mno delay figure yetadds 1h 18m over this leg · 23 runs
- Pakistan Express 46DN46پاکستان ایکسپریس 46 ڈائون00:35 +1d→08:18 +1d7h 43m4% on time · +1h 04madds 1h 10m over this leg · 38 runs
- Allama Iqbal Express 10DN10علامہ اقبال ایکسپریس 10 ڈائون00:50 +1d→08:48 +1d7h 58m24% on time · +1h 11madds 1h 11m over this leg · 35 runs
- Tezgam 8DN8تیزگام 8 ڈاؤن01:55 +1d→09:55 +1d8hno delay figure yetadds 1h 15m over this leg · 37 runs
- Karakoram Express 42DN42قراقرم ایکسپریس 42 ڈائون02:50 +1d→10:15 +1d7h 25mno delay figure yetadds 1h 10m over this leg · 29 runs
- Pak Business 34DN34پاک بزنس 34 ڈائون03:25 +1d→11:01 +1d7h 36mno delay figure yetadds 55 min over this leg · 36 runs
- Millat Express 18DN18ملت ایکسپریس 18 ڈائون04:20 +1d→12:06 +1d7h 46m8% on time · +2h 35madds 1h 03m over this leg · 38 runs
- Karachi Express 16DN16کراچی ایکسپریس 16 ڈائون05:25 +1d→13:05 +1d7h 40mno delay figure yetadds 43 min over this leg · 38 runs
- Sir Sayyed Express 36DN36سر سید ایکپریس 36 ڈاؤن06:00 +1d→13:25 +1d7h 25mno delay figure yetno data over this leg
- Green Line 6DN6گرين لائن 6 ڈاؤن06:35 +1d→13:50 +1d7h 15m36% on time · +39 minadds 1h 02m over this leg · 38 runs
- Rehman Baba Express 48DN48رحمان بابا ایکسپریس 48 ڈاؤن08:05 +1d→16:23 +1d8h 18m14% on time · +1h 56madds 52 min over this leg · 37 runs
- Shah Hussain Express 44DN44شاہ حسین ایکسپریس 44 ڈاؤن08:30 +1d→15:33 +1d7h 03mno delay figure yetno data over this leg
- Awam Express 14DN14عوام ایکسپریس 14 ڈائون09:20 +1d→18:54 +1d9h 34m8% on time · +2h 14madds 1h 05m over this leg · 37 runs
- Hazara Express 12DN12ہزارا ایکسپریس 12ڈاؤن15:20 +1d→00:00 +2d8h 40mno delay figure yetadds 12 min over this leg · 34 runs
- Shalimar Express 28DN28شالیمار ایکسپریس 28 ڈائون19:35→— +1d—39% on time · +27 minno data over this leg
- Sukkur Express 146DN146سکھر ایکسپریس146ڈاؤن21:30→07:03 +1d9h 33mno delay figure yetadds 1h 11m over this leg · 13 runs
- Khyber Mail 2DN2خیبر میل 2 ڈائون21:35 +1d→04:45 +2d7h 10m8% on time · +2h 12madds 1h 24m over this leg · 20 runs
- Fareed Express 38DN38فرید ایکسپریس 38 ڈائون23:00→07:16 +1d8h 16m16% on time · +44 minadds 52 min over this leg · 29 runs
Travelling the other way? Drigh Road to Rohri Jn. trains →
Common questions
How many trains run from Rohri Jn. to Drigh Road?
18 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rohri Jn. to Drigh Road?
Shah Hussain Express 44DN, booked at 7h 03m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rohri Jn. to Drigh Road is most likely to be on time?
Shalimar Express 28DN has the best recorded punctuality of the services we hold enough history for: 39% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 27 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 9 of 18 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rohri Jn. to Drigh Road?
Yes. 5 of the 18 scheduled services are booked to arrive on a later day than they depart: Hazara Express 12DN, Shalimar Express 28DN, Sukkur Express 146DN, Khyber Mail 2DN and others.
Do trains lose time between Rohri Jn. and Drigh Road?
Typically yes. Khyber Mail 2DN adds about 1h 24m to its delay over this leg, measured across 20 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Rohri Jn. to Drigh Road by train?
It is between 462 and 465 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 12 of the 18 services; the rest of the track on this route has not been traced yet.
Are these Rohri Jn. to Drigh Road timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.