Hazara Express 11UP — within 15 minutes of the scheduled time 24% of the time, typically 53 minutes late, over 8 days of recorded runs across every stop of its full journey, not this segment alone. That is its whole-journey record, a different promise from this leg alone: over just Rohri Jn. to Rahim Yar Khan it typically makes up 10 min, from 36 recorded runs. At Rahim Yar Khan it has typically arrived 43 minutes late, from 41 recorded runs.
Every train, compared
10 of 13 with 7+ daysOver this leg is the CHANGE in a train's delay between Rohri Jn. and Rahim Yar Khan on the same run — not how late it arrives; a train can run late through its whole journey and still show no change here. — means either too few recorded runs on this leg, or — permanently, for a train whose journey starts right here at Rohri Jn. — no booked arrival at Rohri Jn. to measure from at all. Figures cover runs recorded between 30 July 2026 and 4 October 2026. why a delay figure changes along the route.
| Train | Departs | Arrives | Duration | Distance | Typical delay | On-time | Over this leg |
|---|---|---|---|---|---|---|---|
| 9Allama Iqbal Express 9UP | 00:05 +1d | 03:18 +1d | 3h 13m | 175 km | +3h 58m | 4% | adds 11 min · 38 |
| 17Millat Express 17UP | 01:05 +1d | 03:55 +1d | 2h 50m | 175 km | +3h 34m | 0% | adds 25 min · 38 |
| 7Tezgam 7UP | 02:00 +1d | 04:34 +1d | 2h 34m | 173 km | +2h 13m | 4% | adds 30 min · 35 |
| 25Bahauddin Zikria Express 25UP | 03:05 +1d | 05:24 +1d | 2h 19m | 175 km | — | — | adds 51 min · 23 |
| 37Fareed Express 37UP | 05:00 +1d | 07:30 +1d | 2h 30m | 175 km | +1h 25m | 6% | adds 43 min · 28 |
| 1Khyber Mail 1UP | 05:55 +1d | 08:40 +1d | 2h 45m | 175 km | +1h 31m | 9% | adds 57 min · 33 |
| 27Shalimar Express 27UP | 14:00 | 16:10 | 2h 10m | 173 km | +57 min | 20% | adds 37 min · 24 |
| 11Hazara Express 11UP | 16:00 | 19:30 | 3h 30m | 175 km | +53 min | 24% | makes up 10 min · 36 |
| 13Awam Express 13UP | 17:20 | 20:31 | 3h 11m | 175 km | +1h 50m | 5% | adds 23 min · 38 |
| 47Rehman Baba Express 47UP | 20:40 | 23:23 | 2h 43m | 175 km | +1h 32m | 11% | adds 31 min · 32 |
| 39Jaffar Express 39UP | 20:50 | 23:50 | 3h | not measured yet | +1h 46m | 0% | adds 15 min · 17 |
| 45Pakistan Express 45UP | 22:00 | 00:42 +1d | 2h 42m | 175 km | — | — | adds 43 min · 37 |
| 33Pak Business 33UP | 23:35 | 02:22 +1d | 2h 47m | 173 km | — | — | adds 15 min · 36 |
What the marks mean
- Departs · Arrives — scheduled local times, published Pakistan Railways timetable
- +1d — a stop on a later day of the train's own run, not a date
- Typical delay · On-time — the train's whole journey, not this segment alone; typical is the median of its recorded stop arrivals, and on-time is within 15 minutes of the scheduled time
- — — fewer than 7 days of recorded runs for that train
- Over this leg — the change in each train's delay between the two stations above, counted on runs recorded at both (a run whose two stations were logged a day apart is matched too, when that day-shifted leg length matches the train's usual one). “adds” means the train picked up extra delay over this stretch; “makes up” means it arrived less late than it left; “no change” means neither. The figure shown is the middle (median) run: no more than half of a train's counted runs did WORSE than it, and no more than half did better — never a claim that exactly half did either, which isn't always possible to state.
- A large “makes up” usually says more about the leg than the train: where several services on this page all recover time, the stretch is booked with room in it. It never means the train ran early — only that it was less late arriving than departing.
- — — in that column: fewer than 7 runs recorded at both stations on the leg's usual booked times, or — permanently, for a train whose journey starts at this page's origin station — no booked arrival there to measure from at all, which will not fill in with more archive age.
Every service in detail
Typical delay and on-time share are the train's whole journey, from 7+ days of recorded runs. Over this leg is the change in that train's delay between the two stations, from runs recorded at both.
- Allama Iqbal Express 9UP9علامہ اقبال ایکسپریس 9 اپ00:05 +1d→03:18 +1d3h 13m4% on time · +3h 58madds 11 min over this leg · 38 runs
- Millat Express 17UP17ملت ایکسپریس 17 اپ01:05 +1d→03:55 +1d2h 50m0% on time · +3h 34madds 25 min over this leg · 38 runs
- Tezgam 7UP7تيزگام 7 اپ02:00 +1d→04:34 +1d2h 34m4% on time · +2h 13madds 30 min over this leg · 35 runs
- Bahauddin Zikria Express 25UP25بہائو الدین زکریا ایکسپری25 اپ03:05 +1d→05:24 +1d2h 19mno delay figure yetadds 51 min over this leg · 23 runs
- Fareed Express 37UP37فرید ایکسپریس 37 اپ05:00 +1d→07:30 +1d2h 30m6% on time · +1h 25madds 43 min over this leg · 28 runs
- Khyber Mail 1UP1خیبر میل 1 اپ05:55 +1d→08:40 +1d2h 45m9% on time · +1h 31madds 57 min over this leg · 33 runs
- Shalimar Express 27UP27شالیمار ایکسپریس 27 اپ14:00→16:102h 10m20% on time · +57 minadds 37 min over this leg · 24 runs
- Hazara Express 11UP11ہزارا ایکسپریس 11 اپ16:00→19:303h 30m24% on time · +53 minmakes up 10 min over this leg · 36 runs
- Awam Express 13UP13عوام ایکسپریس 13 اپ17:20→20:313h 11m5% on time · +1h 50madds 23 min over this leg · 38 runs
- Rehman Baba Express 47UP47رحمان بابا ایکسپریس47اپ20:40→23:232h 43m11% on time · +1h 32madds 31 min over this leg · 32 runs
- Jaffar Express 39UP39جعفر ایکسپریس 39 اپ20:50→23:503h0% on time · +1h 46madds 15 min over this leg · 17 runs
- Pakistan Express 45UP45پاکستان ایکسپریس 45 اپ22:00→00:42 +1d2h 42mno delay figure yetadds 43 min over this leg · 37 runs
- Pak Business 33UP33پاک بزنس 33 اپ23:35→02:22 +1d2h 47mno delay figure yetadds 15 min over this leg · 36 runs
Travelling the other way? Rahim Yar Khan to Rohri Jn. trains →
Common questions
How many trains run from Rohri Jn. to Rahim Yar Khan?
13 scheduled services on the current published timetable. That is what is booked to run, not what ran today.
Which is the fastest train from Rohri Jn. to Rahim Yar Khan?
Shalimar Express 27UP, booked at 2h 10m for the journey. That is the timetable's figure. Whether it holds on the day is what the delay columns describe.
Which train from Rohri Jn. to Rahim Yar Khan is most likely to be on time?
Hazara Express 11UP has the best recorded punctuality of the services we hold enough history for: 24% of its recorded stop arrivals were within 15 minutes of schedule, with a typical delay of 53 min. That is its record across every stop of its full journey, not this leg alone. Measured from recorded runs, not from the timetable. 10 of 13 services on this route currently have enough recorded history to rank at all.
Is there an overnight train from Rohri Jn. to Rahim Yar Khan?
Yes. 2 of the 13 scheduled services are booked to arrive on a later day than they depart: Pakistan Express 45UP, Pak Business 33UP.
Do trains lose time between Rohri Jn. and Rahim Yar Khan?
Typically yes. Khyber Mail 1UP adds about 57 min to its delay over this leg, measured across 33 recorded runs. That is the CHANGE over the leg, not how late the train arrives: a train can run late its whole journey and add nothing here.
How far is it from Rohri Jn. to Rahim Yar Khan by train?
It is between 173 and 175 km along the track, depending on the service. Measured by summing our own GPS traces of trains running the route, not the straight-line distance between the two stations, which is always shorter than the rails. That is measured on 12 of the 13 services; the rest of the track on this route has not been traced yet.
Are these Rohri Jn. to Rahim Yar Khan timings the real arrival times?
No. The departure and arrival columns are what the published timetable books. The delay columns beside them are what we recorded actually happening, from the operator's own reports and from GPS traces of the trains. Where a delay figure is blank we do not yet hold enough recorded runs to publish one.