Allama Iqbal Express 9UP — the run of 17 November 2026
The record stops before Sialkot Jn — last recorded at Lahore Jn. at 14:55.
Every recorded crossing
this run onlyShow the 27 earlier stops
- Karachi CanttCrossedArrive—Depart15:30Delayon time
- Drigh RoadCrossedArrive15:5016:55Depart15:5217:00Delay+1h 03m
- Landhi Jn.CrossedArrive16:1017:17Depart16:1217:25Delay+1h 05m
- Kotri JnCrossedArrive17:5619:41Depart17:5819:45Delay+1h 43m
- Hyderabad JnCrossedArrive18:1520:03Depart18:2020:15Delay+1h 43m
- Tando AdamCrossedArrive19:1921:13Depart19:2121:20Delay+1h 52m
- Nawabshah Jn.CrossedArrive20:0522:18Depart20:1022:30Delay+2h 14m
- MehrabpurCrossedArrive21:2000:07Depart21:2200:12Delay+2h 45m
- GambatCrossedArrive21:5000:37Depart21:5200:41Delay+2h 45m
- Rohri Jn.CrossedArrive23:4001:40Depart00:0502:08Delay+25h 32m
- GhotkiCrossedArrive01:10 +1d03:06Depart01:12 +1d03:10Delay+1h 55m
- SadiqabadCrossedArrive02:48 +1d04:19Depart02:50 +1d04:25Delay+1h 32m
- Rahim Yar KhanCrossedArrive03:18 +1d04:47Depart03:20 +1d04:51Delay+1h 28m
- Khanpur Jn.CrossedArrive03:55 +1d05:39Depart04:00 +1d05:47Delay+1h 40m
- Dera Nawab SahibCrossedArrive04:58 +1d07:05Depart05:00 +1d07:08Delay+2h 05m
- BahawalpurCrossedArrive05:36 +1d07:58Depart05:40 +1d08:04Delay+2h 18m
- Lodhran JnCrossedArrive06:00 +1d08:18Depart06:02 +1d08:24Delay+2h 19m
- DunyapurCrossedArrive06:26 +1d08:53Depart06:28 +1d08:55Delay+2h 24m
- JahaniaCrossedArrive06:50 +1d09:17Depart06:52 +1d09:21Delay+2h 26m
- Khanewal JnCrossedArrive07:25 +1d09:55Depart07:50 +1d10:23Delay+2h 06m
- Mian ChannuCrossedArrive08:25 +1d10:57Depart08:27 +1d11:02Delay+2h 30m
- ChichawatniCrossedArrive09:00 +1d11:27Depart09:02 +1d11:31Delay+2h 25m
- SahiwalCrossedArrive09:33 +1d12:02Depart09:38 +1d12:08Delay+2h 25m
- OkaraCrossedArrive10:05 +1d12:40Depart10:07 +1d12:43Delay+2h 34m
- PattokiCrossedArrive10:40 +1d13:20Depart10:42 +1dDelay+2h 38m
- Kot Radha KishanCrossedArrive11:04 +1d13:44Depart11:06 +1d13:46Delay+2h 38m
- Raiwind Jn.CrossedArrive11:25 +1d14:01Depart11:30 +1d14:05Delay+2h 32m
- Kot LakhpatCrossedArrive12:00 +1d14:31Depart12:02 +1d14:34Delay+2h 30m
- Lahore Jn.CrossedArrive12:30 +1d14:55Depart13:05 +1d14:59Delay+2h 25m
7 stops — no report yet
- Shahdara Bagh JnNo recordArrive13:22 +1dDepart13:24 +1dDelay—
- NarangNo recordArrive14:24 +1dDepart14:26 +1dDelay—
- BaddomalhiNo recordArrive14:55 +1dDepart14:57 +1dDelay—
- Narowal JnNo recordArrive15:30 +1dDepart15:35 +1dDelay—
- Qila Sobha SinghNo recordArrive16:10 +1dDepart16:12 +1dDelay—
- PasrurNo recordArrive16:36 +1dDepart16:38 +1dDelay—
- ChawindaNo recordArrive17:00 +1dDepart17:02 +1dDelay—
- Sialkot JnNo recordArrive17:50 +1dDepart— +1dDelay—
Recorded times come from Pakistan Railways’ control room or from the train’s GPS.
The shape of the run
from the GPS trailWhere this run lost time, where it stood at a stop, and where its tracker went dark — the same journey as the table above, drawn from the raw position trail.
917 GPS positions recorded between 17 Nov 15:20 and 18 Nov 15:04 PKT · 28 of 37 scheduled stops have a recorded time.
How fast it was going
km along the route — route distance from traced track geometry; 0 of 36 stop-to-stop segments measured straight-line.
How late it was running — each step is a station
1 reading beyond 12 h withheld — no second record on this run supports it.
How long it stopped at each scheduled stop
What the marks mean
- A blank means the train’s tracker stopped reporting — it does not mean the train stopped or anything happened to it. 11 gaps on this run, 93 min total.
- 0 readings above 120 km/h, 0 not corroborated by the position trail. All values shown as recorded.
- Grey bar: how long the timetable allows here. Coloured bar: how long it actually stopped, with the figure printed under it. A stand longer than the scale is drawn capped and marked ▲ — the printed figure is always the recorded one. A dash means how long it stood there is unknown — not zero: either no departure was recorded, or the two recorded clocks contradict each other.
- An unwitnessed stop breaks the lateness line — it does not interpolate across it.
- Route distance is measured from traced track geometry where we have it, straight line between the two stations otherwise.
The upper trace above is recorded GPS positions; the lower trace is recorded station crossings — the same crossings shown in the table near the top of this page. A gap in one trace is not a gap in the other.